Autumn Lawn Care UK — September, October & November Lawn Tasks
UK Autumn Lawn Guide 2025/2026

Autumn Lawn Care UK
September, October & November

The most important lawn care season of the year — month-by-month UK autumn lawn tasks. Scarifying, aeration, overseeding, topdressing, feeding and mowing advice for September, October and November.

🟢 September — Renovation 🟠 October — Overseed & Feed 🔵 November — Wind Down

Why Autumn is the Most Important Lawn Season in the UK

Spring gets the attention, but autumn is when everything that determines next year's lawn quality actually happens.

🌡️
Soil Still Warm
Soil above 10°C in Sept–Oct — perfect for seed germination and root development before winter
🌧️
Natural Moisture
UK autumn rainfall reduces irrigation needs — seed and turf establish with minimal watering effort
🌿
Root Growth Priority
Grass shifts energy from top growth to root development in autumn — ideal timing for aeration and feeding
⏱️
8-Week Window
The viable renovation window closes when soil drops below 8–10°C — typically late October to early November
The golden rule of UK autumn lawn care: everything you want to do — scarifying, overseeding, topdressing — must be completed while the soil is still above 10°C. In most of the UK this means a hard deadline of mid to late October. Miss this window and seed will not germinate reliably, meaning bare patches remain bare all winter. Start your renovation programme in early September while you have the most time and warmth to work with.
The correct autumn renovation order: 1) Mow short → 2) Scarify (remove thatch and moss) → 3) Hollow-tine aerate → 4) Topdress with rootzone → 5) Overseed → 6) Apply autumn fertiliser → 7) Water in and keep off grass for 3–4 weeks. Doing these out of sequence reduces effectiveness significantly — particularly scarifying after overseeding, which removes seed you have just applied.
09

🟢 September — Peak Renovation Month

The best month for the full renovation programme. Soil is warmest, moisture is returning and grass has maximum recovery time before winter.

Scarify Aerate Overseed Topdress Autumn Feed Weed Control
🔧
Scarifying — Thatch & Moss Removal
The single most impactful annual lawn task for UK gardens
⭐ Highest Priority September First
Scarifying removes the layer of dead grass, thatch and moss that accumulates between the soil surface and the green grass blades. A thatch layer thicker than 10–15mm suffocates roots, prevents water and nutrients reaching the soil, and creates ideal conditions for moss and fungal disease. September is the best month to scarify — warm soil means the lawn recovers quickly, and you have time to overseed before the soil cools.
  • Mow the lawn 2–3 days before scarifying — cut shorter than usual (25–30mm) to give the machine good access to the thatch layer
  • Set scarifier depth to -3mm for light thatch, -5mm for moderate, -8mm for heavy / thick moss
  • Make the first pass in line with your usual mowing direction — second pass at 90° for moderate/heavy thatch
  • Rake up ALL loosened material immediately — leaving it on the lawn smothers the grass beneath
  • The lawn will look severely stressed and sparse after scarifying — this is completely normal and expected
  • Overseed and topdress immediately after scarifying while the surface is still open
💡 Hire vs buy: A petrol scarifier can be hired for £40–60/day from most UK tool hire companies. Hiring makes sense for most domestic lawns — you only need to scarify once per year in autumn, so purchasing a quality petrol machine (£200–400) only makes sense for larger properties or if you maintain multiple lawns.
September value
9.8
Difficulty
4.5
🕳️
Hollow-Tine Aeration
Relieve soil compaction — critical for drainage and root development
⭐ High Priority Do After Scarifying
Compacted soil prevents air, water and nutrients reaching grass roots — causing poor drainage, moss invasion and thin growth. Hollow-tine aeration removes small cores of soil (8–10cm deep), creating channels for root growth and improving drainage. This is the most effective type for UK clay-heavy lawns. Solid-tine spiking (garden fork or rolling aerator) is a useful lighter alternative for less compacted soils.
  • Aerate after scarifying and before topdressing — the removed cores leave the perfect surface for rootzone to fill
  • Hollow-tine spacing: 10–15cm apart across the full lawn area
  • Leave cores on the surface to dry, then break up with a rake and brush back into the holes
  • For clay-heavy UK soils: aerate 2× per year (autumn + spring); sandy soils: once per year
💡 A hollow-tine aerator can be hired for £20–35/day. For small lawns, a manual hollow-tine tool (push-in type) costs £25–45 and is effective for areas under 50m².
🌱
Overseeding & Bare Patch Repair
The best UK window for grass seed germination — warm soil, returning moisture
⭐ Best Timing Do After Aeration
September is the ideal UK overseeding window — soil temperatures are still above 10°C for reliable germination, autumn moisture reduces watering needs, and the new grass has 6+ weeks to establish before winter. Apply at 20–35 g/m² depending on how patchy the lawn is. Use an amenity perennial ryegrass mix for hard-wearing lawns, or a shade specialist fescue mix under trees.
  • Apply seed immediately after scarifying and aerating — open surface gives best soil contact
  • Use a rotary spreader for even coverage — hand broadcasting creates uneven germination patches
  • Rate: 15–20 g/m² for lightly thin lawns; 25–35 g/m² for patchy/worn; 35–45 g/m² for near-bare renovation
  • Rake lightly after applying to work seed into the surface — do not bury deeply
  • Water if no rain within 48 hours — keep moist for first 10–14 days
  • Keep off the lawn for minimum 3–4 weeks after overseeding
💡 If you miss the September window, overseeding can continue through October with standard amenity ryegrass. Below 8°C soil temperature, only use a specialist Coldstart / cold-tolerant seed mix designed for late autumn sowing.
🪣
Topdressing with Rootzone
Improve soil structure, level surfaces and support new seed establishment
After Aeration Advanced Step
Topdressing — applying a thin layer (5–10mm) of rootzone or topdressing sand — is the most significant long-term improvement you can make to a UK lawn's soil structure. It fills aeration holes, levels uneven surfaces, gradually improves drainage in clay soils and provides an ideal seedbed for overseeded grass. Always use professional rootzone or topdressing sand — never builders sand, which can cement solid over time.
  • Apply 5mm layer for maintenance topdress; 10mm for full post-scarify renovation
  • Work in with a stiff-bristled drag brush or lute — the grass tips must remain visible above the dressing
  • A 10mm layer over 100m² requires approximately 160kg / 6–7 × 25kg bags of rootzone
  • Apply before overseeding so seed sits on the fresh rootzone layer
💡 Rootzone bags (25kg) cost approximately £8–15 each from lawn care suppliers. Order from A1 Lawn, GroundMaster or Hurrells for professional-grade material. A full renovation for 100m² typically requires 6–8 bags.
🌿
Autumn Fertiliser Application
Low nitrogen, high potassium — harden roots for winter, not green growth
Essential After Overseeding
Autumn fertiliser has a fundamentally different purpose to spring feed — it should harden and strengthen grass rather than promote lush growth. Use a low-nitrogen, high-potassium formulation (such as 4-5-10 or similar). High nitrogen in autumn encourages soft top growth that is vulnerable to fusarium patch disease and frost damage — a common and costly mistake.
  • Apply at 25–35 g/m² granular — never exceed product label rate
  • Apply when grass is dry — brush off any granules sitting on grass blades
  • Water in if no rain within 48 hours
  • Do NOT use a spring/summer high-nitrogen feed in autumn — check the NPK numbers
  • Apply September to October — ideally after overseeding has germinated
⚠️ Autumn fertiliser mistake: Never apply a high-nitrogen spring/summer feed in autumn. The resulting soft, lush growth is highly susceptible to fusarium patch disease and frost scorch. Always use a product specifically labelled for autumn use with a low-N, high-K NPK profile.
🌾
Final Weed & Moss Control
Last effective treatment window before winter
September Best Before First Frost
September is the last month when selective weedkillers and ferrous sulphate moss treatments work effectively in the UK. Lawn weeds and moss are still actively growing and will absorb treatments. After mid-October, reducing temperatures slow uptake and reduce effectiveness. Ferrous sulphate moss killer turns moss black within 2 weeks — rake out the blackened moss thoroughly before overseeding.
  • Selective lawn weedkiller (e.g. Verdone, Resolva Lawn): spot-treat persistent weeds or apply overall if widespread
  • Do NOT overseed within 6 weeks of using a selective weedkiller — it will kill new grass seedlings
  • Ferrous sulphate: 35g per litre of water, apply by watering can or knapsack — moss blackens and dies within 14 days
  • Always rake out blackened moss completely before overseeding
10

🟠 October — Secondary Renovation & Feeding

Last chance for overseeding and turfing. Continue autumn feed programme. Mowing frequency drops significantly. Leaf clearance becomes the main weekly task.

Overseed (early Oct) Autumn Feed Lay Turf Leaf Clearance Reduce Mowing
🌱
Late Overseeding — Early October Deadline
Final opportunity for standard seed — soil temp check critical
Deadline: Mid-October Check Soil Temp
Early October remains viable for overseeding in most of the UK — soil typically stays above 10°C until mid to late October in southern England, and slightly earlier in Scotland and northern England. Check soil temperature with a cheap probe thermometer before sowing. If the soil is below 10°C, standard amenity ryegrass will germinate very slowly or not at all. After mid-October in most of the UK, switch to a specialist Coldstart cold-tolerant mix if overseeding must continue.
  • Check soil temperature at 5cm depth before sowing — must be above 10°C
  • Early October: standard amenity ryegrass mix works well in most UK regions
  • Mid–late October: switch to cold-tolerant / Coldstart seed only
  • Sow at 25–35 g/m² — slightly higher rate than September to compensate for slower germination
💡 If you missed the September renovation window entirely, early October still offers a reasonable chance of success. Germination will be slower (14–21 days vs 7–10 days in September) but plants established before November will survive winter and produce a good lawn.
🌾
Laying New Turf
October remains a very good UK turfing month — natural rainfall helps establishment
Good October Task Also Nov if mild
October is one of the best months of the year to lay turf in the UK. The soil is still workable, UK autumn rainfall reduces the need for irrigation, and the turf has all winter to knit in before summer heat stress. Avoid laying on waterlogged ground or during frosty conditions. Order turf the day before you plan to lay — never store rolled turf for more than 24 hours.
  • Prepare the seedbed: dig to 15–20cm, remove all weeds, rake level and firm
  • Lay turf in a brick-bond staggered pattern — never align joints in a straight line
  • Butt rolls tightly together — no gaps, no overlaps
  • Work from a plank on laid turf to avoid footprints on fresh sections
  • Water in thoroughly after laying; keep moist for first 2 weeks
  • Do not mow for 3–4 weeks — until turf has visibly rooted down (tug test)
🍂
Leaf Clearance — Weekly October Task
The most overlooked cause of autumn lawn damage in UK gardens
Weekly Repeat October–November
A thick layer of fallen leaves left on the lawn blocks sunlight and traps moisture — creating the perfect conditions for fusarium patch disease, red thread and other fungal problems that are extremely common on UK autumn lawns. Leaves must be cleared at least weekly from early October onwards, not left to accumulate. This is not a one-off task — it requires consistent weekly attention through October and November.
  • Clear fallen leaves at least once per week — never allow a deep layer to build up
  • Leaf blower or spring-tine rake are both effective — avoid heavy raking on newly overseeded areas
  • Do not blow leaves onto newly overseeded areas of the lawn — they will smother emerging seedlings
  • Dry leaves: compost them — leaf mould is an excellent spring soil conditioner
  • Wet/heavy leaves: bag for council collection — wet leaves compact and take too long to compost usefully
  • Alternatively: raise mower height and mow over lighter leaf falls — the mower shreds and distributes fine pieces that decompose quickly
🚜
October Mowing — Reduce Frequency
Raise cutting height and reduce to fortnightly as growth slows
Fortnightly Raise Height
Grass growth slows significantly in October as temperatures drop. Reduce mowing to every 10–14 days rather than weekly. Raise the cutting height progressively — move from your summer height (typically 25–35mm) up to 40–50mm for winter. Never cut wet grass in autumn — it tears rather than cuts cleanly, and creates ruts and compaction. The last cut of the year for most UK gardens falls in late October or early November.
  • Raise cutting height to 40–50mm for autumn — provides insulation for roots during cold spells
  • Mow every 10–14 days in early October; every 2–3 weeks by late October
  • Never mow in frost or when the lawn is waterlogged
  • Do not cut newly overseeded areas until the new grass is at least 50mm tall (first cut at 35–40mm height)
11

🔵 November — Wind Down & Winter Preparation

Renovation work is largely done. Focus shifts to protecting what you have achieved — final mow, feeding if not yet done, and minimising lawn damage through winter.

Final Mow Last Feed if Needed Leaf Clearance Equipment Clean & Store Avoid Walking on Frost
✂️
Final Cut of the Year
Late October to early November — depends on weather
Timing Varies by Region
The last mow of the year in the UK typically falls in late October to early November, depending on the region and the year's weather. In mild years, grass may continue growing through November. Mow when the grass is actively growing and dry underfoot — never when frosted or waterlogged. Leave the grass at 40–50mm for winter — too short leaves roots exposed and vulnerable to frost; too long encourages fungal disease.
  • Only mow if the grass has been actively growing — do not mow dormant grass
  • Final cut height: 40–50mm — not shorter
  • Must be dry and unfrosted — autumn morning dew and frost cause tearing damage
  • After the final cut: clean the mower deck, sharpen or replace the blade, drain petrol if storing over winter
❄️
Frost & Winter Lawn Protection
Avoid walking on frosted grass — the damage lasts for weeks
Critical Rule November–February
Walking on frosted grass causes the ice crystals inside the grass blades to rupture the cell walls. This produces distinctive dark footprint-shaped dead patches that can persist for weeks or even months. A single crossing of a frosted lawn can leave permanent-looking marks that ruin all the renovation work carried out in autumn. This rule applies to anyone walking on the lawn — children, pets and adults.
  • Never walk on frosted or frozen grass — the damage shows as dark patches within days
  • If you have regular crossing routes, install stepping stones before the first hard frost
  • Do not allow pets to run on frosted grass
  • Do not park on frosted turf — severe and irreversible compression damage results
⚠️ A single set of footprints across a frosted lawn can leave dead dark patches that persist for 4–8 weeks. The damage from one crossing can undo months of lawn renovation work. This is the most common and preventable winter lawn care mistake in UK gardens.
🔩
Mower & Equipment Winter Storage
Maintain your tools in November for smooth spring start
November Task
November is the time to service and store your lawn care equipment properly, so it is ready to use immediately when spring arrives. A blade that has not been sharpened all winter will tear rather than cut grass in spring — causing brown tips and increasing disease susceptibility.
  • Clean all soil and grass from mower deck, scarifier and aerator before storage
  • Petrol mowers: run the engine until the carburettor is empty, or use fuel stabiliser
  • Sharpen or replace the mower blade — a sharp blade makes a massive difference to spring lawn appearance
  • Battery equipment: store batteries at 40–60% charge in a cool, dry location — not in a freezing shed
  • Oil all metal moving parts of manual tools to prevent rust
🌿
Late Autumn Feed (if not yet applied)
Final winter hardener if the autumn feed was missed
If Missed in Sept–Oct
If you did not apply an autumn fertiliser in September or October, early November is the last viable window for a late winter hardener feed — very low nitrogen, high potassium formulation. This helps grass cells harden before sustained cold. However, do not feed if the ground is frozen or if heavy frost is forecast within the next 48 hours — granules sitting on frozen soil do nothing and may cause scorching when conditions change.
  • Only apply if the soil is above 5°C and no frost forecast within 48 hours
  • Use a winter lawn feed or low-N autumn product — not a spring/summer feed
  • Reduce rate slightly vs September application: 15–20 g/m²
  • Water in lightly if no rain forecast

UK Autumn Lawn Care Checklist

Tick off each task as you complete it — click any item to mark it done.

🟢 September
Peak renovation month
Mow lawn short (25–30mm) before scarifyingMUST
Scarify to remove thatch and mossMUST
Rake up all scarified debrisMUST
Hollow-tine aerate compacted areasKEY
Apply topdressing / rootzone (10mm layer)KEY
Overseed at 25–35 g/m²MUST
Apply autumn fertiliser (low-N, high-K)MUST
Treat weeds before overseeding (6wk gap)KEY
Apply ferrous sulphate if moss presentKEY
Keep off lawn for 3–4 weeks post-seedMUST
Water if no rain within 48 hoursKEY
🟠 October
Secondary renovation & feed
Check soil temp — must be above 10°C to overseedMUST
Late overseed if missed in September (early Oct)KEY
Lay turf if starting a new lawnKEY
Apply autumn fertiliser if not done in SeptMUST
Clear fallen leaves — weekly taskWEEKLY
Raise mower height to 40–50mmKEY
Reduce mowing to every 10–14 daysKEY
First mow of newly overseeded areas (50mm+)OPT
Solid-tine spike if not hollow-tined in SeptOPT
Level any bumps or low spotsOPT
🔵 November
Wind down & protect
Final mow of the year (40–50mm height)MUST
Continue weekly leaf clearanceWEEKLY
Never walk on frosted grassRULE
Late autumn feed if not yet applied (above 5°C only)OPT
Clean mower deck and scarifier thoroughlyKEY
Sharpen or replace mower bladeKEY
Drain petrol or use fuel stabiliserKEY
Store batteries at 40–60% in frost-free locationKEY
Install stepping stones for winter crossing routesOPT
Lay turf in mild non-frosty spellsOPT

Autumn Lawn Care Timeline

The correct order and timing for UK autumn lawn renovation — week by week through September, October and November.

Early September (Weeks 1–2)
Pre-renovation mow + weed and moss treatment
Mow short at 25–30mm. Apply selective weedkiller if needed — allow 4–6 weeks before overseeding. Apply ferrous sulphate for moss. This is the preparation phase before the main renovation work.
Mid September (Weeks 3–4) — Peak Window
🏆 Main renovation: Scarify → Aerate → Topdress → Overseed
The most important 2–3 days of the entire lawn year. Scarify first, aerate, apply rootzone topdressing, then overseed immediately. Do all four steps in close succession while the surface is open. Water in thoroughly. Keep off lawn for 3–4 weeks.
Late September (After 7–10 days)
First germination visible — apply autumn fertiliser
New seedlings should be visible within 7–10 days. Once germination is underway, apply autumn fertiliser (low-N, high-K) to support root development. Continue to water if dry. Still keep foot traffic off the new growth.
Early October
First mow of overseeded areas — leaf clearance begins
Once new grass reaches 50mm, first mow at 35–40mm. Leaf clearance becomes a weekly task from now on. Late overseeding still viable in early October — check soil temperature first.
Mid–Late October
Overseeding deadline — raise mowing height
Standard seed deadline approaching as soil cools below 10°C. Raise mower cutting height to 40–50mm. Reduce mowing frequency to fortnightly. Lay turf if planning a new lawn — October is an excellent turfing month.
Early November
Final mow of the year + equipment storage
Last mow if grass still actively growing. Leave at 40–50mm. Clean and service all equipment. Store safely for winter. Late autumn feed if not yet applied — only if above 5°C and no frost forecast.
November Through Winter
Protection mode — leaves, frost and minimal disturbance
Continue weekly leaf clearance. Never walk on frosted grass. Avoid any equipment or vehicle on the lawn during wet or frosty conditions. The lawn will look its worst in January–February — this is normal. Growth resumes when soil temperature exceeds 8°C in spring.

UK Autumn Lawn Care — Rate Reference Table

Application rates and timing for all key autumn UK lawn treatments.

Treatment Rate / Depth September October November Notes
Scarifying -3 to -10mm depth; 1–3 passes ✅ Best ⚠️ Early only ❌ Too late Must be done before overseeding. Heavy thatch: 3 passes at 90°
Hollow-Tine Aeration 8–10cm deep cores; 10–15cm spacing ✅ Best ✅ Good ⚠️ Mild only Do after scarifying, before topdressing. Clay lawns: twice yearly
Topdressing 5mm light / 10mm renovation ✅ Best ✅ Good ❌ Too late Rootzone or topdressing sand only — never builders sand
Overseeding — Standard Seed 15–45 g/m² depending on condition ✅ Ideal ⚠️ Early Oct only ❌ Below 10°C Soil must be above 10°C. August–September is the optimal UK window
Coldstart / Cold-Tolerant Seed 25–40 g/m² ✅ ✅ ⚠️ Early Nov Specialist mix for sowing below 10°C — check product label for minimum temp
Autumn Fertiliser (Low-N) 25–35 g/m² granular ✅ Best ✅ Good ⚠️ Above 5°C only Low-N, high-K only. Never use spring/summer high-N product in autumn
Turfing Add 10–15% wastage to area ✅ ✅ Ideal ⚠️ Mild spells only October is the best UK turfing month. Avoid waterlogged or frosted ground
Ferrous Sulphate (Moss) 35g/litre water by watering can ✅ Best ⚠️ Reducing ❌ Ineffective Rake out blackened moss after 14 days — before overseeding
Weedkiller (Selective) Per product label ✅ Last window ⚠️ Early only ❌ Ineffective Allow 4–6 weeks before overseeding. Never apply near new seedlings

Swipe to see full table

7 Common UK Autumn Lawn Care Mistakes

The errors that most commonly undo autumn lawn renovation work in UK gardens.

1. Scarifying after overseeding
The most common sequencing error. Scarifying removes seed you have just applied. Always scarify → aerate → topdress → overseed in that order.
2. Using spring feed in autumn
High-nitrogen feed in autumn produces soft growth that is vulnerable to fusarium patch disease and frost damage. Always use a specific autumn low-N, high-K formulation.
3. Sowing seed below 10°C soil temperature
Standard amenity ryegrass will not germinate reliably below 10°C. Sowing when the soil is too cold leads to rotting seed and bare patches all winter.
4. Walking on frosted grass
Ice crystals in frozen grass blades shatter under foot pressure, leaving permanent-looking dark patches. The most preventable winter lawn damage in UK gardens.
5. Leaving fallen leaves on the lawn
A thick leaf layer blocks light and traps moisture, causing fusarium and red thread fungal disease. Must be cleared at least weekly — not as a single one-off task.
6. Using builders sand for topdressing
Builders sand can set cement-like over time in UK clay soils. Always use professional rootzone or sports-grade topdressing sand from a reputable lawn supplier.
7. Cutting grass too short for winter
Scalping the lawn for the final cut of the year exposes roots to frost damage and creates ideal conditions for moss invasion. Leave the final cut at 40–50mm. Never mow below 30mm in autumn.

UK Autumn Lawn Care — Frequently Asked Questions

Answers to the most common autumn lawn care questions from UK gardeners.

Begin your autumn lawn care routine in early September, when soil temperatures remain above 10°C and the worst of the summer heat and drought stress has passed. September gives you the maximum warm-soil window for overseeding and the most recovery time before winter. In Scotland and northern England, start in late August if conditions allow. The key driver is soil temperature — not calendar date — so use an inexpensive soil thermometer to confirm conditions before overseeding.
Most UK lawns benefit from scarifying once per year in autumn. However, if your lawn has little thatch buildup (the soil surface feels firm underfoot and grass is dense and healthy), a light raking may be sufficient in some years. Lawns with significant moss, high foot traffic or shaded areas in damp conditions typically need annual scarifying. Light scarifying every year is better than infrequent aggressive scarifying — the latter causes much more temporary stress to the lawn.
Standard amenity perennial ryegrass requires soil temperatures above 10°C to germinate reliably — in most of the UK this rules out overseeding from mid-late October onwards. However, specialist cold-tolerant or Coldstart grass seed mixes are formulated to germinate at temperatures as low as 5–7°C, making November overseeding viable in mild spells. These are available from specialist UK suppliers including Hurrells and GroundMaster. Results are slower and less reliable than September sowing, but worthwhile if bare patches must be addressed before spring.
If you overseed after scarifying (which you should), keep foot traffic off the lawn for at least 3–4 weeks to allow seed to germinate and new seedlings to establish. Walking on germinating seed dislodges seeds, compacts the fresh rootzone and can kill emerging seedlings. If you have dogs or children, consider a temporary barrier around the overseeded area. After 3–4 weeks with visible germination, light foot traffic is acceptable — avoid heavy use until spring.
Yes — completely normal and expected. A lawn that has been heavily scarified for the first time, especially if it had significant thatch or moss, will look sparse, brown and severely stressed immediately afterwards. Some first-time scarifiers are shocked by the result and think they have damaged the lawn. This apparent damage is temporary. With overseeding and autumn conditions, the lawn will typically look visibly better within 3–4 weeks, and significantly improved by spring. The worse it looks after scarifying, the more thatch and dead material was removed — and the more beneficial the treatment was.
The last cut of the year in the UK typically falls between late October and mid-November, depending on the year's weather and your region. Grass stops active growth when soil temperature drops below approximately 8–10°C. In mild years — which the UK experiences increasingly frequently — some growth may continue into December. The rule is: only mow if the grass is actively growing AND the lawn is dry and unfrosted. Never mow waterlogged or frozen grass. Leave the final cut at 40–50mm for winter protection.